Arc Energy Reduction Systems
An arc energy reduction system is a means built into a service or feeder overcurrent device - zone-selective interlocking, differential relaying, an energy-reducing maintenance switch, an active arc flash mitigation system, an instantaneous trip setting or override, fuse clearing time at the arcing current, current-limiting electronically actuated fuses, or an approved equivalent means - that clears an arcing fault inside the equipment faster than the normal protection would, so the incident energy a worker faces at that location is lower. This form records the system-level performance test that NFPA 70 (NEC) 240.87 and 240.67 call for on circuit breakers and fuses rated or adjustable to 1200 A or more: that the method is documented and set below the available arcing current taken from the arc flash study, that the installed hardware matches the documented method, and that every device or interlock pair operates when tested by primary current injection or another approved method. Relay-side tests of the reduction function belong on the microprocessor-based protective relay acceptance form; this form complements it.
An arcing fault inside a switchboard, switchgear or motor control center releases energy for as long as the overcurrent device takes to clear it. An arc energy reduction method shortens that time, which lowers the incident energy and the arc flash boundary on the equipment label and, where the incident energy analysis method is used, the protective equipment a worker needs; the PPE category tables give no credit for the reduction setting. A method set above the arcing current never engages, and one whose switch, interlock wiring or sensors are damaged may not clear the fault at all, while the label on the door still promises the reduced value. The acceptance record shows that the method was set from the study, that its hardware is complete, and that it operated under test, and it gives the authority having jurisdiction the written record the code asks for.
NFPA 70 (NEC) 240.87 and 240.67 require the performance test when the system is first installed on site, and the form records whether this record is that first-installation test and whether the written record was made available to the authority having jurisdiction. The code sets no recurring interval. A re-test interval comes from the owner maintenance program, from the manufacturer, or from NFPA 70B-2026, which assigns intervals by equipment condition and lists an arc reduction test, per the manufacturer instructions, for circuit breakers, switches, transfer switch equipment and protective relays; the form records which basis was used and the next test due. NFPA 70E-2027 asks for the incident energy analysis to be reviewed at intervals of no more than 5 years and updated when the system changes, and a changed reduction setting is such a change, so the form carries a review check and a request for a study update where settings changed.
The form opens with the device, its highest continuous trip setting available, the overcurrent device providing the reduction, the reduction method and the NEC edition in force. A documentation review checks that the method is documented and shown set below the arcing current, that the manufacturer field test instructions are on hand, that the arc flash risk assessment is documented and that the arc flash label carries the voltage, boundary, incident energy or PPE level, and date. The setting basis comes from the arc flash study: the available arcing current, the reduced arcing current where the study reports one, and the study inputs, each compared with the IEEE 1584-2018 model range so an input outside it raises a review flag. The work condition during the test is recorded: an electrically safe work condition, or an energized test under a stated NFPA 70E-2027 exception with the shock and arc flash risk assessments. The inspection confirms that the installed hardware matches the documented method, that enclosure, devices and wiring are undamaged, that any maintenance switch, status indicator, interlock wiring and detection sensors are in place, and that as-found settings are recorded. The performance test then exercises each device or interlock pair by primary current injection, or by another approved method with its approver recorded where injection cannot prove the system; per row the reduced-mode and normal-mode settings, the test current, the manufacturer maximum clearing time, the measured clearing time and the operation observed are entered. A checklist for the method in use follows: restraint checked in both directions for zone-selective interlocking, pickup and through-fault for differential relaying, engagement, indication and return to normal settings for the maintenance switch, the manufacturer simulated event for an active mitigation system, a permanent instantaneous setting verified by injection, fuse class and rating matching the study, or an approved equivalent means. The form closes with as-left settings, normal protection confirmed, the label reviewed against the as-left settings and a study update requested where settings changed.
Identification: NEC edition, equipment type, the overcurrent device providing the reduction, nameplate and location data, nominal voltage, continuous current rating, the highest continuous trip setting available, trip unit or relay model and firmware, and the reduction method. Applicability: whether the device is rated or adjustable to 1200 A or higher, the authority having jurisdiction and the basis or exemption claimed. Documentation and label checks. From the study: document, revision and date, available and reduced arcing current, the study voltage, bolted fault current, gap, working distance and clearing time with their model-range flags, the method operating threshold and its margin, and the fuse clearing time and curve reference where that method is used. Work condition and risk assessment references. Per tested row: device or interlock pair, test method, reduced-mode and normal-mode settings, margin, test current, manufacturer maximum and measured clearing time, and the operation observed. The manufacturer procedure reference, any other approved method and its approver, return-to-service checks, qualified person and qualification basis, test date, first-installation flag, written record and submission reference for the authority having jurisdiction, re-test basis and next test due, test equipment with calibration due, comments and deficiencies.
Four rules decide the verdict, and all must pass. The method operating threshold must sit below the available arcing current from the study: the margin, the lower of the arcing current and the reduced arcing current where the study reports one under IEEE 1584-2018, minus the threshold, must be at least 0.01 A. Where the fuse method is clearing time, the clearing time at the available arcing current read from the fuse time-current curve must be 0.07 s or less; the field stays blank when another fuse means is used, since that means satisfies NFPA 70 (NEC) 240.67 whatever the curve shows. On each tested row the reduced-mode setting in effect must sit at least 0.01 A below the lower arcing current, or the reduction cannot engage; a row with no reduced-mode setting is not graded on this, and settings are entered in amperes, so a value typed in kA fails. Every tested device or interlock pair must have operated: operated as expected or with intentional delay passes, did not operate fails, and where the operation select and the checkbox disagree the row reads as not operated and an issue is raised. The code states no pass value for the performance test, so that operation rule is the UltraDb acceptance criterion. The measured clearing time is compared with the manufacturer maximum but is not graded by the verdict; a negative margin raises an issue for the reviewer. The applicability threshold, the label content, the age of the study review, the IEEE 1584-2018 model-range flags and the work-condition items are recorded, not graded. The arcing current always comes from the arc flash study and is never computed on the form.
Reference pages for the tests this form carries.
UltraDb references ASTM, ANSI, IEEE, NETA, NFPA, NEMA, FAA, TIA, and IEC standards descriptively, to identify the published methods its forms are built from. UltraDb and Verlecta are not affiliated with, endorsed by, certified by, or licensed by NETA, ASTM, ANSI, IEEE, NFPA, NEMA, FAA, TIA, IEC, or Megger. Standard names and section numbers are the property of their respective organizations. Always test to the edition your contract specifies. Where a standard is sold through the ANSI webstore, Verlecta may earn a commission on a purchase made through our link, at no extra cost to you. A commission never decides which standards we cite or how a form is built.