Grounding Systems
The telecommunications bonding and grounding installation verification records a building's bonding system before telecommunications equipment is installed: the primary bonding busbar (PBB) and secondary bonding busbars (SBB) with their size, listing, copper content, insulators, connectors and labels; the bonding conductors (the TBC to the service ground, the TBBs, the BBCs that join them, SBCs, TEBCs, rack and equipment bonds and structural metal bonds) with their size against the governing size, color, labels at both ends, connection type and bend radius; the backbone bonding conductor spacing; racks and cabinets with their own conductor, connection, paint removal and door jumpers; the separations of the primary protector conductor and the TEBC; an installation checklist; and the two-point continuity test. Electrode resistance and soil resistivity are measured on their own forms and referenced here with the design target shown, never graded. Mesh bonding networks and the construction values of the annexes are out of scope. Identifiers and labels follow ANSI/TIA-606-D.
The bonding system is what gives telecommunications equipment, its surge protection and the people who service it a low-impedance path to the building's grounding electrode system. A busbar of the wrong size or copper content, a conductor smaller than the backbone it joins, a mechanical connection where a weld or two-hole lug belongs, a rack bonded through its neighbor, paint under a lug, a missing warning label or a backbone with no cross-connection at the top floor are all easy to build and hard to see once racks are loaded. ANSI/TIA-607-E fixes the components, sizes, connections and the two-point test, and ANSI/TIA-606-D the identifiers and labels; recording the installation against them before the equipment arrives, while every conductor is still reachable and no parallel path confuses the reading, is what makes the verification meaningful.
The verification is made after the busbars, bonding conductors and rack bonds are installed and before telecommunications equipment goes in, because installed equipment creates parallel paths that can invalidate the two-point reading. The visual inspection that the system is installed to the standard comes first and is recorded before any reading; a voltage test on the path precedes the continuity measurement. A whole-building record cannot pass until a PBB busbar row and a TBC conductor row are recorded; a record that covers part of a building, with the PBB and TBC on another record, is exempt from that check. Soil resistivity is tested before the electrode system is designed, and the electrode result lives on the grounding systems form, so both are linked rather than repeated.
The record names the building, the rooms, the design document and revision, the adopted code edition, whether the building is multi-tenant, the floors or single-story length, the scope and the site class. The installation checklist marks each requirement satisfactory, unsatisfactory or not applicable: busbar surfaces cleaned, PBB location, the panelboard bonded, the primary protector on the PBB, TBBs continuous and spliced correctly, no size decrease, ferrous conduit bonded, pathways and shields bonded, structural metal bonded, RBBs bonded and the BBC extent. Each busbar row takes its type, identifier, thickness and width, listing, insulator, copper content, connector potential and label. Each conductor row takes its designation and the two ends it joins, size, the governing size it is checked against, routed length, color, labels and their content, connection type at the busbar or rack, and bend radius and angle. The backbone section takes the layout, whether a BBC sits at the top floor, the largest floor gap and the largest spacing in a single-story building. Each rack or cabinet takes its own conductor, size, connection, paint removal and the door jumper size and type. Separations take the primary protector conductor to dc power and high-frequency cables, the TEBC to other cable groups and to ferrous metal, and the RBB insulator stand-off. The two-point test records the instrument and its mode, whether the voltage test and the visual inspection were done, whether equipment was already installed, and for each path the ends, conductor size and length, the reading in milliohms, the computed conductor allowance and the review limit. The form derives a pass flag per check and a completeness flag per section.
Identification: building, rooms, drawing reference and revision, multi-tenant, code edition, floors, single-story length, scope, site class and design target. Per busbar: identifier, type, thickness, width, listed, insulator, copper content, connector potential, label. Per conductor: designation, type, from and to, size, governing size, length, color, label at each end and its content, connection type, bend radius and angle, and the computed size, color, label and connection checks. Backbone: layout, top-floor BBC, largest floor gap, largest spacing. Per rack or cabinet: identifier, own conductor, size, connection, paint, door jumper size and type. Separations: protector conductor to dc power, TEBC to cable groups, TEBC to ferrous metal or bonded, RBB insulator distance. Two-point test: instrument, mode, voltage test, equipment installed, visual inspection done, and per path the ends, size, length, reading, conductor allowance, limit and flag. The checklist answers, the completeness rows, the links to the electrode and soil results, test equipment, comments and deficiencies.
The record passes when no installation check is unsatisfactory, every busbar and conductor check reads 1 and the completeness rows are met. A PBB is at least 6.35 mm by 100 mm, an SBB 6.35 mm by 50 mm and an RBB the cross-section of 6 AWG; every busbar is listed, copper or copper alloy of at least 95 percent IACS, on a listed insulator for the PBB and SBBs, with connectors under 300 mV of electrochemical potential to the bar, and the PBB and each SBB labeled. A TBB is at least 6 AWG, the TBC at least the largest TBB, a BBC at least the largest TBB it joins, SBCs and TEBCs at least 6 AWG and the governing size, an equipment bond at least the maker's size or 12 AWG, and a structural metal bond the size the standard's length table gives. An insulated conductor is green or marked green, labeled at every termination with the warning naming whom to contact, and landed by exothermic weld or a listed two-hole lug at a busbar or rack; a mechanical connection fails, and a connection away from a busbar is accepted only for a BBC, a TEBC or a structural metal bond. The inside bend radius at a PBB or SBB is at least 200 mm with an included angle of at least 90 degrees. With two or more TBBs, a BBC joins them at the top floor and at least every third floor, or at most every 10 m in a large single-story building. Each rack or cabinet has its own conductor of at least 6 AWG, never daisy-chained, a listed two-hole compression or two-screw terminal block connection, paint removed at the bond unless listed hardware or a welded frame, and doors jumpered with 12 AWG stranded or equal braid. The primary protector conductor keeps 0.3 m from dc power, switchboard and high-frequency cables, the TEBC 50.8 mm from other cable groups and 50 mm from ferrous metal or bonded to it, and RBB insulators give at least 19 mm. Review flags, never a fail: the recommended backbone size for routed length, a UBC not landed by compression, the two-point test run on a volt-ohm meter or without a prior voltage test or with equipment installed, and a reading above 100 milliohm plus the path's conductor resistance (a convention disclosed on the form). The 25 and 5 ohm electrode targets are shown and never graded here.
UltraDb references ASTM, ANSI, IEEE, NETA, NFPA, NEMA, FAA, TIA, and IEC standards descriptively, to identify the published methods its forms are built from. UltraDb and Verlecta are not affiliated with, endorsed by, certified by, or licensed by NETA, ASTM, ANSI, IEEE, NFPA, NEMA, FAA, TIA, IEC, or Megger. Standard names and section numbers are the property of their respective organizations. Always test to the edition your contract specifies. Where a standard is sold through the ANSI webstore, Verlecta may earn a commission on a purchase made through our link, at no extra cost to you. A commission never decides which standards we cite or how a form is built.