Batteries and DC Systems

Direct-Current Systems, Rectifiers - Acceptance Test

Battery voltage under a constant load, holding on its plateau before falling to the end voltage.

What it is

The Direct-Current Systems, Rectifiers acceptance form covers a rectifier that supplies a stationary DC system: the rectifier transformer, the semiconductor converter and its DC output, the DC system the unit feeds, and an optional harmonic survey at the point of common coupling. A battery charger on its own is recorded on the separate battery charger form, and a traction unit is recorded against its owner specification. The form opens with the application, the charger unit type (utility-type, communications-type, or neither), the rectifier type and pulse number, the ratings and whether a separate rectifier transformer is fitted. From there it carries the transformer nameplate, the charger nameplate and construction checks, a visual and mechanical inspection, insulation resistance, the transformer tests (winding resistance, ratio, polarity, excitation current, impedance), a ratio and phase angle section for a displacement that is not a multiple of 30 degrees, the converter checks, output performance at load steps, optional dynamic response and input balance, current limit and charger controls, function checks, telecom noise for a communications-type charger, the DC system interface, alarms and ground detection, and the harmonic survey. The unit type decides which NEMA rows grade: a utility-type charger against NEMA PE 5-1997, a communications-type charger against NEMA PE 7-2018.

Why it is performed

A rectifier is the source that holds a DC bus inside its design window and keeps a battery at the right float and equalize voltage. A transformer with a ratio or impedance away from its nameplate, a converter whose protection or cooling does not operate, an output with excess ripple or poor regulation, or a current limit set below the rated output can damage the battery, mislead the loads the bus serves or leave the system unprotected. Harmonic current drawn by the converter is also felt at the point of common coupling, where the limits of IEEE 519-2022 apply to the whole installation. Recording the transformer, the converter, the output and the DC system interface on one form, against the manufacturer data and the standards cited on it, settles the condition of the unit before it carries the system and gives the reviewer the margins behind every verdict.

When it is performed

This is an acceptance form: it is run on a new rectifier, or on one whose transformer, converter or output stage has been replaced or repaired, before the unit is placed in service on the DC system. The insulation tests are made with the unit de-energized and the semiconductor devices shorted or isolated as the manufacturer directs; the output, regulation, ripple, current limit, alarm and harmonic readings are made with the unit energized, at the load steps and conditions the form names. The ripple and regulation rows against the NEMA standards grade only when the test conditions are reproduced: a true rms meter, the battery terminals, float mode, the inlet air temperature and the AC input inside its rated range. The harmonic survey is optional and grades only from a Class A analyzer at the point of common coupling with at least a day of data; a survey recorded on the separate harmonic survey form can be linked instead of repeated.

How it is typically performed

The record starts with the nameplates: the transformer nameplate items and whether the plate shows both rms and fundamental kVA and legible lines of the required height, then the charger nameplate items, fuse and terminal markings, the AC grounding terminal, an overcurrent device in every ungrounded input lead and the manual on hand. The visual and mechanical checklist covers the drawings, terminal markings, accessories, enclosure and cooling, the semiconductor stack and snubbers, torqued terminations, grounding and the DC protective devices. Insulation resistance is read primary to secondary and ground, secondary to primary and ground, primary to secondary, rectifier stack to ground and DC bus to ground at the manufacturer test voltage, and the lowest reading is compared with the manufacturer minimum. The transformer tests record winding resistance with the winding temperature, the ratio deviation per phase at the tap tested, polarity, excitation current, measured impedance with the winding arrangement, and the factory applied potential from the test report; a transformer whose displacement is not a multiple of 30 degrees gets its measured phase displacement and voltage ratio per phase. The converter checks follow the manufacturer procedure. Output performance is taken at load steps with the AC input, DC output, and rms ripple at the battery terminals, plus no-load and full-load voltage and extra load points for the regulation deviation. The current limit, high-voltage shutdown, alarm setpoints and temperature compensation are recorded and the alarms and ground detection are tested. The DC system interface takes the nominal voltage, grounding, battery type, cell count, float and equalize settings, the design window and the highest and lowest bus voltages, the ground detector, the available fault current and the sizing calculation. Where a harmonic survey is run, the point, the short-circuit and demand currents, the instrument and the Figure 1 answer go in with the voltage and current distortion statistics.

Reference: FIST 3-6, section 9.1, page 95 (April 2020).

What gets recorded

Identification: application, charger unit type, manufacturer, model and serial, rectifier type, pulse number, rated DC voltage and current, AC input, cooling, transformer arrangement and service rating class. Transformer nameplate: rms and fundamental kVA, voltages and connections, percent impedance, commutating reactance, phase displacement, insulation system, BIL and temperature rise. Insulation: test voltage, temperature, the five readings, the manufacturer minimum and the margin. Transformer tests: winding temperature and resistances, tap, displacement class, ratio deviations and margins, polarity, excitation currents, impedance with its tolerance, and the factory applied potential. Output: filter class, supply frequency, inlet air temperature, the ripple conditions, each load step with AC and DC readings and ripple against the manufacturer and NEMA limits, battery condition, no-load and full-load voltage, regulation mode and deviation, and efficiency. Controls: current-limit setpoint and measured value, shutdown and alarm setpoints, temperature compensation. DC system: nominal voltage, grounding, battery type and cells, float and equalize settings, design window and bus extremes, ground detector readings, fault current and interrupting rating, and required charger output. Harmonic survey: measurement point, short-circuit and demand currents, instrument and window, the DER question, and the voltage and current distortion statistics with their limits.

How results are evaluated

The verdict is set by a short list of graded rows; most other rows raise an issue for the reviewer without failing the record. On the transformer, each phase ratio is within 0.5 percent of the nameplate ratio at the tap tested when the displacement is a multiple of 30 degrees (half a turn on a nearest-turn winding, never tighter than 0.5 percent), the measured impedance sits inside the tolerance that IEEE C57.18.10-2021 with IEEE C57.12.00-2021 or IEEE C57.12.01-2020 assigns to the insulation system and winding arrangement, and a displacement that is not a multiple of 30 degrees has its phase angle within 1 degree of the nameplate and its voltage ratio within 1 percent. On a NEMA charger, rms ripple at the battery terminals stays within the millivolt row of NEMA PE 5-1997 or NEMA PE 7-2018 for the nominal voltage, filter class and battery condition; the regulation deviation over five load points is not above 0.5 percent in float or 1.0 percent in equalize; the current-limit setpoint lies above the rated DC output current; and the high-voltage shutdown is fitted and operates. A communications-type charger at 48 V nominal or less also keeps its weighted and peak-to-peak noise within the NEMA PE 7-2018 limits. The bus voltage stays inside the DC system design window from equalize to the end of discharge, limits included. Where a harmonic survey is graded, the weekly 95th percentile total demand distortion and band values stay below the IEEE 519-2022 limit for the short-circuit ratio, the weekly 99th below 1.5 times it and the daily 99th below 2.0 times it, a reading equal to the limit fails, and a DC offset at the point of common coupling fails; the voltage distortion limits belong to the system owner and raise a review issue only. Insulation resistance against the manufacturer minimum, ripple and regulation against the manufacturer data, the dynamic response figures, alarm setpoint bands, interrupting ratings and charger sizing are issue-only. Conditions matter: a ripple or regulation row without its test conditions, or a survey without a Class A instrument and enough data, is recorded and not graded.

Governing standards

IEEE C57.18.10-2021

IEEE C57.18.10-2021

Purchase this standard ↗

IEEE 519-2022

IEEE 519-2022

Purchase this standard ↗

IEEE 946-2020

IEEE 946-2020

Purchase this standard ↗

NEMA PE 5-1997

NEMA PE 5-1997

Purchase this standard ↗

NEMA PE 7-2018

NEMA PE 7-2018

Purchase this standard ↗

IEEE C57.12.00-2021

IEEE C57.12.00-2021

Purchase this standard ↗

IEEE C57.12.01-2020

IEEE C57.12.01-2020

Purchase this standard ↗

Run this test in UltraDb.

Start free ->

UltraDb references ASTM, ANSI, IEEE, NETA, NFPA, NEMA, FAA, TIA, and IEC standards descriptively, to identify the published methods its forms are built from. UltraDb and Verlecta are not affiliated with, endorsed by, certified by, or licensed by NETA, ASTM, ANSI, IEEE, NFPA, NEMA, FAA, TIA, IEC, or Megger. Standard names and section numbers are the property of their respective organizations. Always test to the edition your contract specifies. Where a standard is sold through the ANSI webstore, Verlecta may earn a commission on a purchase made through our link, at no extra cost to you. A commission never decides which standards we cite or how a form is built.