Insulation resistance testing applies a direct voltage across insulation and measures the small current that results, reported as a resistance. It shows whether moisture, contamination or aging has weakened the insulation on transformers, cables, motors, switchgear and breakers, and it is a routine check before energizing and on a maintenance schedule.

Insulation resistance climbing over the test as the insulation absorbs charge; the marked readings give the polarization index.

What it is

An insulation resistance test applies a steady direct voltage between a conductor and ground, or between two separate windings or phases, and measures the current that flows through and across the insulation. The instrument divides the applied voltage by that current and reports the result as a resistance, usually a very large one. Healthy insulation passes only a tiny current, so a high reading is good news and a low or falling reading is a warning. The test is used on power and distribution transformers, power and control cable, motors and generators, switchgear and busway, circuit breakers, and many other assemblies whose job is to keep energized parts apart from each other and from ground. Done as intended it is non-destructive: the voltage is chosen to stress the insulation without approaching its breakdown strength. The reading is not a property of the material alone. It reflects the whole insulation system, including its surface condition, its moisture content, its temperature and the size or length of the equipment under test, which is why results are always read together with the conditions in which they were taken. It is among the most widely performed electrical tests in the field because it is quick, repeatable and needs only a portable instrument.

Why it is done

Insulation usually weakens gradually before it fails. Moisture ingress, surface contamination from dust, oil or salt, thermal aging, mechanical damage and chemical attack all lower its resistance, and the change shows up in a reading long before the equipment trips. Finding it during a planned outage is far cheaper than finding it during a fault, when a breakdown can destroy a winding or a cable, start a fire, or put people at risk. For that reason the test is run on new equipment before it is energized, to confirm that shipping, storage and installation did no harm; after repairs or long periods of storage; and on a recurring schedule for equipment in service. The value of the schedule comes from the record it builds. A single reading says something, but a series taken under comparable conditions says much more, because a steady decline points to a developing problem even when every individual reading still looks acceptable. The test also screens equipment ahead of more demanding tests, since there is little sense in stressing insulation that is already visibly wet or dirty.

The principle

When a direct voltage is applied to insulation, the current that flows is the sum of three parts. The first is the capacitive charging current, a brief surge as the insulation charges like a capacitor, which dies away quickly. The second is the absorption current, which comes from the slow realignment of charge within the insulating materials and decays over a longer period. The third is the leakage current, a small steady flow through the insulation itself and across its surfaces. Because the first two parts shrink with time while the leakage part stays roughly constant, the total current falls and the resistance calculated from it rises for as long as the voltage stays on. Clean, dry insulation shows a steady climb over the duration of the test. Wet or contaminated insulation has a large leakage component from the start, so the reading is low and flattens early. Ratios of timed readings summarize how much the reading climbs. The dielectric absorption ratio compares two readings taken early in the test, and the polarization index compares readings taken over a longer span. Because both are ratios, they depend little on the size of the equipment and less on temperature than a single reading does, which gives a way to judge condition. Temperature matters a great deal: insulation resistance falls sharply as temperature rises, so a warm reading cannot be compared directly with a cold one unless both are corrected to a common reference temperature. Humidity and surface condition act on the leakage path in the same way, which is why they are noted with every result.

How it is performed

Safe preparation comes first. The equipment is de-energized, isolated from every source, proven free of voltage and grounded, following the owner's lockout and work-permit procedures. Connections that could carry the test voltage into other equipment, such as surge arresters, electronic devices or cables to remote loads, are disconnected or otherwise protected. The surfaces of bushings and terminations are cleaned and dried so that surface leakage does not mask the condition of the insulation underneath. The tester is connected between the part under test and ground, with the remaining windings or phases grounded, or connected to the instrument's guard terminal when the aim is to measure one insulation path at a time. The guard terminal diverts surface leakage, or the current of paths that are not of interest, around the measuring circuit. With the leads connected, the temporary ground is removed from the part under test only, and the other parts stay grounded. The test voltage is selected from the governing standard's table for the voltage class of the equipment, never by rule of thumb, and the instrument is confirmed to be in calibration. The voltage is then applied and held while timed readings are taken, and the values are written down as they are observed, not reconstructed afterward. When the test ends, the insulation is discharged through the instrument and then with a grounding hook, and it stays grounded for a period related to how long it was charged, because large capacitive equipment can hold a dangerous charge. Ambient temperature, equipment temperature and relative humidity are recorded at the time of the test, and the same instrument and voltage class are used on repeat tests so that results can be trended.

What is recorded

The record of an insulation resistance test is short and general. It holds the resistance readings at each timed interval, the ratio derived from them where one is used, the voltage class that was applied and how long it was held, the temperature of the equipment and of the surroundings, the relative humidity, and the identity of the instrument together with its calibration status. It also notes the as-found condition of the equipment, for example clean and dry, freshly removed from service, or visibly contaminated, and any connections that were lifted to isolate the item. These details matter because a resistance reading has meaning only alongside the conditions that produced it. Months later, a person comparing a new result with the stored one needs to know whether temperature, voltage and setup were comparable, or whether the difference they see may be explained by the way the test was done.

How results are judged

No single number decides whether insulation is acceptable, and this page does not give one. Published criteria take several shapes that are used together. The first is an absolute minimum that steps up with the voltage class of the equipment; the governing tables are found in ANSI/NETA ATS-2025 for acceptance testing and in ANSI/NETA MTS-2023 for maintenance testing, and they differ by equipment type. The second is correction of the reading to a reference temperature before any comparison, because warm insulation reads lower than cold insulation. The third is comparison between like parts, such as the three phases of a winding, where an outlier points to a local problem. The fourth is trending against earlier results on the same equipment, where a steady decline matters even if the readings stay above a published minimum. The fifth is the set of timed-reading ratios, the dielectric absorption ratio and the polarization index, which have their own published guidance and are judged on the shape of the climb. Manufacturer data and nameplate information come into play as well. Readings are best judged together, with the test conditions in view. For the actual values and tables, refer to your own licensed copy of the standards named above, which remain the authority for acceptance.

Variations

Acceptance and maintenance tests differ in purpose. An acceptance test establishes that new or repaired equipment is sound and creates the baseline for later comparison, so it is performed carefully under the best conditions available. A maintenance test checks the condition of equipment already in service, where the useful question is how the reading has changed since the last one, so repeatable conditions and method matter most. The equipment class changes the details. On rotating machines the ratio of timed readings and the winding temperature carry more weight, and the machine is usually tested with the other windings grounded and with a longer series of timed readings. On cables the length and the condition of the terminations affect the reading, and shields and neighboring conductors are handled according to the cable type. On transformers the combinations tested, windings to ground and windings to each other, and the oil-filled or dry-type construction shape the interpretation. On low-voltage gear and breakers, readings across open poles and from pole to frame are common, and the test voltage follows the low-voltage rating of the gear, with solid-state trip units, meters and surge protection disconnected or isolated before the test. In every case the procedure follows the governing standard for that equipment class.

Where this test is called for

The equipment classes and standard sections that call for this test, and the UltraDb forms that carry it.

Automatic Transfer Switches

Emergency System Automatic Transfer Switch Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.22.3.B.2; ATS-2025 7.22.3.B.3; ATS-2025 7.22.3.D.2; ATS-2025 7.22.3.D.3; ATS-2025 Table 100.1; MTS-2023 7.22.3.B.2

Batteries and DC Systems

Direct-Current Systems, Rectifiers Acceptance
Cited in: IEEE C57.18.10-2021 7.8

Circuit Breakers and Switchers

Automatic Circuit Recloser (Oil/Vacuum) - Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.24.1.B.2; ATS-2025 7.24.1.B.4; ATS-2025 7.24.1.D.2; ATS-2025 7.24.1.D.4; MTS-2023 7.24.1.B.2; MTS-2023 7.24.1.B.4; Table 100.1
Low-Voltage Molded-Case Circuit Breaker Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.6.1.1.1.B.1; ATS-2025 7.6.1.1.1.D.1 / Table 100.1; ATS-2025 Table 100.1; MTS-2023 7.6.1.1.B.2
Low-Voltage Insulated-Case Circuit Breaker Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.6.1.1.2.B.1; ATS-2025 7.6.1.1.2.D.1; ATS-2025 7.6.1.1.2.D.3; MTS-2023 7.6.1.1.B; Table 100.1
Low-Voltage Power Circuit Breaker Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.6.1.2.B.1; ATS-2025 7.6.1.2.D.1; ATS-2025 7.6.1.2.D.3; MTS-2023 7.6.1.2.B.2; Table 100.1
Medium-Voltage Air Circuit Breaker Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.6.1.3.B.1; ATS-2025 7.6.1.3.B.3; ATS-2025 7.6.1.3.D.1; ATS-2025 7.6.1.3.D.3; MTS-2023 7.6.1.3.B.2; MTS-2023 7.6.1.3.B.3; Table 100.1
Medium- and High-Voltage Oil Circuit Breaker Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.6.2.B.2; ATS-2025 7.6.2.B.5; ATS-2025 7.6.2.D.2; ATS-2025 7.6.2.D.5; MTS-2023 7.6.2.B; Table 100.1
Vacuum Circuit Breaker Medium-Voltage Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.6.3.B.1; ATS-2025 7.6.3.B.2; ATS-2025 7.6.3.D.1; ATS-2025 7.6.3.D.2; ATS-2025 Table 100.1; MTS-2023 7.6.3.B
SF6 Circuit Breaker Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.6.4.B.2; ATS-2025 7.6.4.B.5; ATS-2025 7.6.4.D.2; ATS-2025 7.6.4.D.5; MTS-2023 7.6.4.B; Table 100.1
SF6 Circuit Switcher Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.7.B.3; ATS-2025 7.7.B.4; ATS-2025 7.7.D.3 / Table 100.1; ATS-2025 7.7.D.4; MTS-2023 7.7.B

Bus Structures and Busways

Outdoor Bus Structure Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.21.B.2; ATS-2025 7.21.D.2; ATS-2025 Table 100.1; MTS-2023 7.21.B.2; Table 100.1
Metal-Enclosed Busways - Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.4.B.2; ATS-2025 7.4.D.2.a; ATS-2025 7.4.D.2.b / Table 100.1; MTS-2023 7.4.B.2

Cables

Low-Voltage Cable Acceptance Test (to 1,000 V) Acceptance / Maintenance
Cited in: ATS-2025 7.3.2.B.1; ATS-2025 7.3.2.D.1 / Table 100.1; ATS-2025 Table 100.1; ATS-2025 Table 100.1, Note 6; MTS-2023 7.3.2.B
Medium- and High-Voltage Shielded Cable Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.3.3.B.1; ATS-2025 7.3.3.D.1; ATS-2025 Table 100.1; MTS-2023 7.3.3.B.2

Capacitors

Capacitor Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.20.1.B.2; ATS-2025 7.20.1.D.2; MTS-2023 7.20.1.B.2; Table 100.1

Adjustable Speed Drives

Adjustable Speed Drive System Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.17.B.4; ATS-2025 7.17.D.4; MTS-2023 7.17.B.4

Engine Generators

Emergency Systems Engine Generator Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.22.1.B.1; ATS-2025 7.22.1.D.1; ATS-2025 7.22.1.D.1.1; ATS-2025 7.22.1.D.1.2; MTS-2023 7.22.1.B.1; Table 100.11

Instrument Transformers

Current Transformer Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.10.1.B.1; ATS-2025 7.10.1.B.6; ATS-2025 7.10.1.D.1 / Table 100.5; ATS-2025 7.10.1.D.6 / Table 100.5; MTS-2023 7.10.1.B.2; MTS-2023 7.10.1.B.7
Voltage Transformer Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.10.2.B.1; ATS-2025 7.10.2.B.1 / Table 100.5; ATS-2025 7.10.2.D.1 / Table 100.5; MTS-2023 7.10.2.B.2
Coupling-Capacitor Voltage Transformer Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.10.3.B.2; ATS-2025 7.10.3.D.2; MTS-2023 7.10.3.B.2; Table 100.5
Instrument Transformer, High-Accuracy Acceptance
Cited in: IEEE C57.13.1-2017 10

Rotating Machinery and Motor Control

AC Induction Motor and Generator Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.15.1.B.2; ATS-2025 7.15.1.D.2 / Table 100.11; ATS-2025 7.15.1.D.2.1; ATS-2025 7.15.1.D.2.2; IEEE 43-2013 11.2; IEEE 43-2013 12.2; IEEE 43-2013 12.2.1; IEEE 43-2013 12.3; IEEE 43-2013 5.3; IEEE 43-2013 5.4; IEEE 43-2013 5.5; IEEE 43-2013 6.2; IEEE 43-2013 6.3.1; IEEE 43-2013 6.3.2; IEEE 43-2013 6.3.3; IEEE 43-2013 6.3.4; IEEE 43-2013 Annex A; IEEE 43-2013 Clause 4; IEEE 43-2013 Clause 7; IEEE 43-2013 Clause 8; IEEE 43-2013 Equation (2); IEEE 43-2013 Equation (3); IEEE 43-2013 Equation (4); IEEE 43-2013 Equation (5); IEEE 43-2013 Table 1; IEEE 43-2013 Table 3; IEEE 43-2013 Table 4 Note 1; MTS-2023 7.15.1.B.2
Synchronous Motor and Generator Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.15.2.B.14; ATS-2025 7.15.2.B.2; ATS-2025 7.15.2.D.14 / Table 100.11; ATS-2025 7.15.2.D.2 / Table 100.11; ATS-2025 7.15.2.D.2.1; ATS-2025 7.15.2.D.2.2; IEEE 43-2013 11.2; IEEE 43-2013 12.2; IEEE 43-2013 12.2.1; IEEE 43-2013 12.3; IEEE 43-2013 5.3; IEEE 43-2013 5.4; IEEE 43-2013 5.5; IEEE 43-2013 6.2; IEEE 43-2013 6.3.1; IEEE 43-2013 6.3.2; IEEE 43-2013 6.3.3; IEEE 43-2013 6.3.4; IEEE 43-2013 Annex A; IEEE 43-2013 Clause 4; IEEE 43-2013 Clause 7; IEEE 43-2013 Clause 8; IEEE 43-2013 Equation (2); IEEE 43-2013 Equation (3); IEEE 43-2013 Equation (4); IEEE 43-2013 Equation (5); IEEE 43-2013 Table 1; IEEE 43-2013 Table 3; IEEE 43-2013 Table 4 Note 1; MTS-2023 7.15.2.B
DC Motor and Generator Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.15.3.B.2; ATS-2025 7.15.3.B.2.1-.2; ATS-2025 7.15.3.D.2; IEEE 43-2013 11.2; IEEE 43-2013 12.2; IEEE 43-2013 12.2.1; IEEE 43-2013 5.3; IEEE 43-2013 5.4; IEEE 43-2013 5.5; IEEE 43-2013 6.2; IEEE 43-2013 6.3.1; IEEE 43-2013 6.3.2; IEEE 43-2013 6.3.3; IEEE 43-2013 6.3.4; IEEE 43-2013 Annex A; IEEE 43-2013 Clause 4; IEEE 43-2013 Clause 7; IEEE 43-2013 Clause 8; IEEE 43-2013 Equation (2); IEEE 43-2013 Equation (3); IEEE 43-2013 Equation (4); IEEE 43-2013 Equation (5); IEEE 43-2013 Table 1; IEEE 43-2013 Table 3; MTS-2023 7.15.3.B.2; Table 100.11
Low-Voltage Motor Control and Starter Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.16.1.1.B.1; ATS-2025 7.16.1.1.B.2; ATS-2025 7.16.1.1.D.1; ATS-2025 7.16.1.1.D.2; MTS-2023 7.16.1.1.B.2; MTS-2023 7.16.1.1.B.3; Table 100.1
Medium-Voltage Motor Starter Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.16.1.2.B.1; ATS-2025 7.16.1.2.B.2; ATS-2025 7.16.1.2.D.1; ATS-2025 7.16.1.2.D.2; ATS-2025 Table 100.1; ATS-2025 Table 100.5; MTS-2023 7.16.1.2.B.2; MTS-2023 7.16.1.2.B.3

Network Protectors

600-Volt Class Network Protector Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.8.B.2; ATS-2025 7.8.B.4; ATS-2025 7.8.D.2; ATS-2025 7.8.D.4; MTS-2023 7.8.B.2; MTS-2023 7.8.B.4; Table 100.1

Reactors

Dry-Type Reactor Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.20.3.1.B.2; ATS-2025 7.20.3.1.D.2; ATS-2025 Table 100.1; MTS-2023 7.20.3.1.B.2; Table 100.1

Regulating Apparatus

Step Voltage Regulator Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.12.1.1.B.2; ATS-2025 7.12.1.1.D.2; MTS-2023 7.12.1.1.B.2; Table 100.14; Table 100.5
Load Tap-Changer Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.12.3.B.1; ATS-2025 7.12.3.D.1 / Table 100.5; MTS-2023 7.12.3.B.2
Regulating Apparatus, Current Acceptance
Cited in: IEEE C57.15-2017 9.7.7; IEEE C57.15-2017 9.7.7.5; IEEE C57.15-2017 9.7.7.6

Protective Relays

Ground-Fault Protection Systems, Low-Voltage - Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.14.B.2; ATS-2025 7.14.B.3; ATS-2025 7.14.D.2; ATS-2025 7.14.D.3; MTS-2023 7.14.B
Protective Relays, Electromechanical and Solid-State - Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.9.1.B.1; ATS-2025 7.9.1.D.1; MTS-2023 7.9.1.B.1
Microprocessor-Based Protective Relay Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.9.2.B.1; ATS-2025 7.9.2.D.1; MTS-2023 7.9.2.B.1

Resistors and Grounding Impedance

Resistor Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.20.4.B.2; ATS-2025 7.20.4.B.2 / Table 100.1; ATS-2025 7.20.4.D.2 / Table 100.1; ATS-2025 Table 100.1; ATS-2025 Table 100.14.1; MTS-2023 7.20.4.B.2

Reclosers and Sectionalizers

Automatic Line Sectionalizers, Oil - Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.24.2.B.2; ATS-2025 7.24.2.D.2; ATS-2025 Table 100.1; MTS-2023 7.24.2.B.2

Photovoltaic Systems

Solar Photovoltaic Systems Acceptance Test Acceptance
Cited in: ATS-2025 7.29.B.3; ATS-2025 7.29.D.3; ATS-2025 Table 100.1

Surge Arresters and Protection

Surge Protective Device Low-Voltage Acceptance Test Acceptance / Maintenance
Cited in: MTS-2023 7.19.1.B.2; MTS-2023 7.19.1.D.2 / ATS-2025 Table 100.1
Surge Arresters, Medium- and High-Voltage - Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.19.2.B.2; ATS-2025 7.19.2.D.2; MTS-2023 7.19.2.B; Table 100.1

Switches

Low-Voltage Air Switch Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.5.1.1.B.3; ATS-2025 7.5.1.1.D.3 / Table 100.1; MTS-2023 7.5.1.1.B
Air-Insulated Medium-Voltage Metal-Enclosed Switch - Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.5.1.2.B.3; ATS-2025 7.5.1.2.D.3; MTS-2023 7.5.1.2.B; Table 100.1
Air Switch, Medium- and High-Voltage, Open - Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.5.1.3.B.3; ATS-2025 7.5.1.3.B.3 / Table 100.1; ATS-2025 7.5.1.3.B.4; ATS-2025 7.5.1.3.D.3 / Table 100.1; ATS-2025 7.5.1.3.D.4; ATS-2025 Table 100.1; MTS-2023 7.5.1.3.B.3; MTS-2023 7.5.1.3.B.4
Medium-Voltage Oil Switch Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.5.2.B.3; ATS-2025 7.5.2.B.4; ATS-2025 7.5.2.D.3; ATS-2025 7.5.2.D.4; MTS-2023 7.5.2.B; Table 100.1
Vacuum Switch Medium-Voltage Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.5.3.B.3; ATS-2025 7.5.3.B.7; ATS-2025 7.5.3.D.3; ATS-2025 7.5.3.D.7; ATS-2025 Table 100.1; MTS-2023 7.5.3.B; Table 100.1
SF6 Switch Medium-Voltage Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.5.4.B.3; ATS-2025 7.5.4.B.6; ATS-2025 7.5.4.D.3 / Table 100.1; ATS-2025 7.5.4.D.6; MTS-2023 7.5.4.B
Switches and Cutouts - Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.5.5.B.3; ATS-2025 7.5.5.D.3 / Table 100.1; ATS-2025 Table 100.1; MTS-2023 7.5.5.B.3

Switchgear and Switchboard Assemblies

Switchgear and Switchboard Assembly Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.1.1.B.2; ATS-2025 7.1.1.B.4; ATS-2025 7.1.1.D.2; ATS-2025 7.1.1.D.4; MTS-2023 7.1.B; Table 100.1
Panelboard Assemblies - Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.1.2.B.1; ATS-2025 7.1.2.D.1 / Table 100.1; ATS-2025 Table 100.1

Transformers

Dry-Type, Air-Cooled, Low-Voltage Transformer Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.2.1.1.B.2; ATS-2025 7.2.1.1.B.2 / Table 100.5; ATS-2025 7.2.1.1.D.2; ATS-2025 7.2.1.1.D.2 / Table 100.5; MTS-2023 7.2.1.1.B.2
Dry-Type Air-Cooled (Large) Transformer Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.2.1.2.B.2; ATS-2025 7.2.1.2.D.2; MTS-2023 7.2.1.2.B.2; Table 100.5

Transformer, Liquid-Filled

Liquid-Filled Transformer Acceptance Test Acceptance / Maintenance
Cited in: ATS-2025 7.2.2.B.2; ATS-2025 7.2.2.D.2; MTS-2023 7.2.2.B.2; Table 100.5

Governing standards

Maintenance Testing Specifications for Electrical Power Equipment and Systems

Purchase this standard ↗

Questions

Why does the reading keep rising while the test voltage is applied?

The charging and absorption parts of the current fade as the insulation becomes polarized, leaving mostly the small steady leakage current. With the current falling and the applied voltage constant, the calculated resistance climbs. Clean, dry insulation shows a clear climb; wet or dirty insulation shows little, because leakage dominates from the start.

Why must readings be corrected for temperature?

Insulation resistance drops as the temperature of the insulation rises, so a warm reading and a cold reading of the same sound equipment can look very different. Correcting each result to a common reference temperature, using the method given in the governing standard, lets results from different days and seasons be compared fairly.

Is an insulation resistance test safe for the equipment?

When the test voltage is matched to the equipment rating and the procedure is followed, the test is considered non-destructive, because the voltage is chosen to stress the insulation gently and not to approach breakdown. Insulation that is already wet, contaminated or badly aged can still be harmed, so inspection and cleaning come first.

Where do I find the minimum acceptable values?

In the tables of the governing standards, for example ANSI/NETA ATS-2025 for acceptance work and ANSI/NETA MTS-2023 for maintenance work, which depend on equipment type and voltage class. Use your licensed copy of the standard, and compare against earlier results and manufacturer data as well.

Record this test in UltraDb.

Start free ->

UltraDb references ASTM, ANSI, IEEE, NETA, NFPA, NEMA, FAA, TIA, and IEC standards descriptively, to identify the published methods its forms are built from. UltraDb and Verlecta are not affiliated with, endorsed by, certified by, or licensed by NETA, ASTM, ANSI, IEEE, NFPA, NEMA, FAA, TIA, IEC, or Megger. Standard names and section numbers are the property of their respective organizations. Always test to the edition your contract specifies. Where a standard is sold through the ANSI webstore, Verlecta may earn a commission on a purchase made through our link, at no extra cost to you. A commission never decides which standards we cite or how a form is built.